Midkiff #1865 — Inspections

Total: 10 inspections

Begin End Operator Hours Inspectors
08/11/2022 08/11/2022 ACG Materials 3.00 1
04/27/2021 04/27/2021 ACG Materials 1.75 1
05/27/2020 05/27/2020 ACG Materials 2.75 1
02/07/2019 02/07/2019 ACG Materials 7.50 2
09/12/2017 09/13/2017 ACG Materials 7.00 1
10/27/2015 10/28/2015 ACG Materials 18.00 1
08/10/2015 08/10/2015 ACG Materials 7.25 1
10/28/2013 10/30/2013 ACG Materials 5.00 1
05/14/2013 05/15/2013 Pinnacle Materials LLC 9.75 2
10/31/2011 11/07/2011 Hardin-Walker Development Inc 28.50 1