Total: 14 inspections

Begin End Operator Hours Inspectors
10/31/2012 11/27/2012 Fleenor Inc 11.50 2
07/16/2012 09/27/2012 Fleenor Inc 2.00 1
12/06/2010 12/30/2010 Fleenor Inc 3.25 1
05/18/2010 06/07/2010 Fleenor Inc 46.50 1
10/29/2009 01/26/2010 Fleenor Inc 67.50 2
10/21/2009 10/21/2009 Fleenor Inc 4.00 2
04/29/2009 09/08/2009 Fleenor Inc 27.50 2
04/09/2009 04/13/2009 Fleenor Inc 10.50 1
12/01/2008 01/07/2009 Fleenor Inc 36.25 1
11/21/2008 12/03/2008 Fleenor Inc 6.25 1
09/03/2008 09/29/2008 Fleenor Inc 56.00 4
12/15/2007 03/17/2008 Fleenor Inc 54.50 2
08/14/2007 09/20/2007 Fleenor Inc 68.50 3
01/05/2007 01/29/2007 Fleenor Inc 52.00 1