Mine #17 — Inspections
Total: 31 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 02/06/2013 | 02/06/2013 | Blair Coal Co Inc. | 8.50 | 2 |
| 01/22/2013 | 01/22/2013 | Blair Coal Co Inc. | 5.50 | 1 |
| 10/15/2012 | 10/18/2012 | Blair Coal Co Inc. | 30.00 | 2 |
| 10/10/2012 | 12/20/2012 | Blair Coal Co Inc. | 67.50 | 1 |
| 10/02/2012 | 11/15/2012 | Blair Coal Co Inc. | 51.50 | 3 |
| 08/14/2012 | 08/14/2012 | Blair Coal Co Inc. | 9.50 | 1 |
| 07/03/2012 | 08/27/2012 | Blair Coal Co Inc. | 154.00 | 4 |
| 06/11/2012 | 06/11/2012 | Blair Coal Co Inc. | 12.50 | 2 |
| 06/07/2012 | 06/08/2012 | Blair Coal Co Inc. | 17.50 | 3 |
| 04/02/2012 | 04/30/2012 | Blair Coal Co Inc. | 63.50 | 1 |
| 03/29/2012 | 03/29/2012 | Blair Coal Co Inc. | 8.00 | 1 |
| 01/10/2012 | 01/11/2012 | Blair Coal Co Inc. | 9.00 | 1 |
| 01/05/2012 | 01/05/2012 | Blair Coal Co Inc. | 3.50 | 1 |
| 01/03/2012 | 02/03/2012 | Blair Coal Co Inc. | 52.00 | 1 |
| 10/12/2011 | 10/12/2011 | Blair Coal Co Inc. | 16.00 | 1 |
| 10/04/2011 | 11/21/2011 | Blair Coal Co Inc. | 67.00 | 2 |
| 09/30/2011 | 09/30/2011 | Blair Coal Co Inc. | 4.50 | 1 |
| 09/22/2011 | 09/22/2011 | Blair Coal Co Inc. | 13.50 | 2 |
| 09/12/2011 | 09/12/2011 | Blair Coal Co Inc. | 8.00 | 1 |
| 08/08/2011 | 08/31/2011 | Blair Coal Co Inc. | 48.00 | 2 |
| 08/05/2011 | 08/05/2011 | Blair Coal Co Inc. | 6.00 | 1 |
| 07/01/2011 | 09/12/2011 | Blair Coal Co Inc. | 44.00 | 3 |
| 06/09/2011 | 07/09/2011 | Blair Coal Co Inc. | 72.00 | 1 |
| 05/27/2011 | 06/15/2011 | Blair Coal Co Inc. | 16.00 | 1 |
| 05/05/2011 | 05/05/2011 | Blair Coal Co Inc. | 8.00 | 1 |
| 02/12/2010 | 02/12/2010 | Appalachian Contractors Inc | 4.00 | 1 |
| 02/09/2010 | 02/09/2010 | Appalachian Contractors Inc | 8.00 | 2 |
| 01/14/2010 | 01/22/2010 | Appalachian Contractors Inc | 25.00 | 2 |
| 01/13/2010 | 02/02/2010 | Appalachian Contractors Inc | 19.50 | 1 |
| 11/18/2009 | 12/14/2009 | Appalachian Contractors Inc | 13.50 | 2 |
| 11/06/2009 | 11/06/2009 | Appalachian Contractors Inc | 8.00 | 1 |