Mine No 1 — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
08/05/2004 08/11/2004 Fcdc Coal Inc 3.50 1
04/09/2001 04/09/2001 Fcdc Coal Inc 9.00 1
03/13/2001 03/19/2001 Fcdc Coal Inc 10.25 1
03/08/2001 03/19/2001 Fcdc Coal Inc 10.25 1
03/05/2001 03/19/2001 Fcdc Coal Inc 26.50 1
08/21/2000 09/14/2000 Fcdc Coal Inc 4.50 1