Mine No 1 — Inspections
Total: 36 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 01/17/2002 | 02/05/2002 | Tennco Inc | 9.00 | 1 |
| 10/22/2001 | 12/11/2001 | Tennco Inc | 16.00 | 1 |
| 08/16/2001 | 08/16/2001 | Tennco Inc | 8.00 | 1 |
| 07/03/2001 | 08/27/2001 | Tennco Inc | 82.50 | 1 |
| 06/04/2001 | 06/06/2001 | Tennco Inc | 20.00 | 1 |
| 05/24/2001 | 05/24/2001 | Tennco Inc | 8.00 | 1 |
| 04/11/2001 | 06/26/2001 | Tennco Inc | 108.50 | 1 |
| 04/10/2001 | 04/12/2001 | Tennco Inc | 18.00 | 1 |
| 04/05/2001 | 04/10/2001 | Tennco Inc | 8.00 | 1 |
| 02/21/2001 | 03/28/2001 | Tennco Inc | 75.50 | 1 |
| 02/06/2001 | 02/07/2001 | Tennco Inc | 16.00 | 1 |
| 01/16/2001 | 01/16/2001 | Tennco Inc | 27.00 | 2 |
| 01/02/2001 | 01/22/2001 | Tennco Inc | 64.00 | 1 |
| 12/19/2000 | 12/21/2000 | Tennco Inc | 6.50 | 1 |
| 12/09/2000 | 12/11/2000 | Tennco Inc | 16.00 | 1 |
| 12/04/2000 | 12/08/2000 | Tennco Inc | 28.00 | 1 |
| 11/06/2000 | 12/15/2000 | Tennco Inc | 116.00 | 1 |
| 11/06/2000 | 12/08/2000 | Tennco Inc | 48.00 | 1 |
| 10/18/2000 | 10/23/2000 | Tennco Inc | 20.00 | 1 |
| 10/04/2000 | 10/23/2000 | Tennco Inc | 130.00 | 6 |
| 08/21/2000 | 08/23/2000 | Tennco Inc | 20.00 | 1 |
| 07/27/2000 | 09/29/2000 | Tennco Inc | 144.50 | 7 |
| 06/06/2000 | 06/06/2000 | Tennco Inc | 4.50 | 1 |
| 06/05/2000 | 06/07/2000 | Tennco Inc | 6.00 | 1 |
| 06/05/2000 | 06/06/2000 | Tennco Inc | 4.00 | 1 |
| 06/05/2000 | 06/06/2000 | Tennco Inc | 18.00 | 1 |
| 04/24/2000 | 06/28/2000 | Tennco Inc | 139.00 | 1 |
| 04/18/2000 | 04/18/2000 | Tennco Inc | 3.25 | 1 |
| 04/10/2000 | 04/12/2000 | Tennco Inc | 11.00 | 1 |
| 04/10/2000 | 04/12/2000 | Tennco Inc | 13.00 | 1 |
| 03/15/2000 | 03/16/2000 | Tennco Inc | 4.00 | 1 |
| 03/15/2000 | 03/16/2000 | Tennco Inc | 9.00 | 1 |
| 03/13/2000 | 03/16/2000 | Tennco Inc | 10.00 | 1 |
| 03/08/2000 | 03/30/2000 | Tennco Inc | 108.50 | 4 |
| 01/20/2000 | 02/01/2000 | Tennco Inc | 65.00 | 1 |
| 01/04/2000 | 01/05/2001 | Tennco Inc | 8.00 | 1 |