Mine No 2 — Inspections

Total: 8 inspections

Begin End Operator Hours Inspectors
04/04/2001 04/09/2001 C J & L Mining Inc 12.00 1
03/12/2001 03/14/2001 C J & L Mining Inc 5.00 1
02/23/2001 02/23/2001 C J & L Mining Inc 8.00 1
11/29/2000 11/29/2000 C J & L Mining Inc 8.00 1
09/12/2000 09/14/2000 C J & L Mining Inc 10.00 1
05/17/2000 05/17/2000 C J & L Mining Inc 8.00 1
02/01/2000 02/01/2000 C J & L Mining Inc 10.00 1
01/10/2000 01/11/2000 C J & L Mining Inc 7.00 1