Mine No. 3 — Inspections

Total: 20 inspections

Begin End Operator Hours Inspectors
10/21/2016 10/21/2016 Roadway Unlimited LLC 4.50 1
06/30/2016 06/30/2016 Roadway Unlimited LLC 8.00 1
01/07/2016 01/19/2016 Roadway Unlimited LLC 18.50 1
04/06/2015 06/10/2015 Roadway Unlimited LLC 29.50 1
12/05/2014 03/27/2015 Roadway Unlimited LLC 84.50 1
07/08/2014 07/08/2014 Roadway Unlimited LLC 9.00 1
04/07/2014 05/22/2014 Roadway Unlimited LLC 83.50 1
01/16/2014 01/16/2014 Roadway Unlimited LLC 14.00 1
12/27/2013 12/27/2013 Roadway Unlimited LLC 6.50 1
11/22/2013 12/18/2013 Roadway Unlimited LLC 54.00 1
10/02/2013 10/04/2013 Roadway Unlimited LLC 22.00 1
07/11/2013 08/08/2013 Roadway Unlimited LLC 50.50 2
11/29/2012 11/29/2012 Black Gem Mining, Inc. 3.50 1
01/03/2012 03/26/2012 Black Gem Mining, Inc. 23.00 1
12/15/2011 12/15/2011 Black Gem Mining, Inc. 7.00 1
06/22/2011 08/08/2011 Black Gem Mining, Inc. 42.00 2
04/06/2011 05/02/2011 Black Gem Mining, Inc. 44.75 1
02/08/2011 03/29/2011 Black Gem Mining, Inc. 84.00 1
02/04/2011 02/17/2011 Black Gem Mining, Inc. 8.00 1
04/05/2010 09/13/2010 Phoenix Resources, LLC 132.00 2