Mine No 3 — Inspections

Total: 102 inspections

Begin End Operator Hours Inspectors
12/08/2008 12/31/2008 Ambush Mining Inc 32.25 4
06/09/2008 07/08/2008 Ambush Mining Inc 8.50 1