Mine No 6 — Inspections

Total: 75 inspections

Begin End Operator Hours Inspectors
01/27/2016 01/27/2016 Coal River Mining LLC 3.00 1
10/01/2015 11/20/2015 Coal River Mining LLC 15.00 1
04/06/2015 06/01/2015 Coal River Mining LLC 83.00 1
01/21/2015 01/21/2015 Coal River Mining LLC 14.00 2
10/15/2014 12/29/2014 Coal River Mining LLC 160.50 1
09/30/2014 10/01/2014 Coal River Mining LLC 7.50 1
09/23/2014 09/23/2014 Coal River Mining LLC 4.00 1
09/23/2014 09/23/2014 Coal River Mining LLC 8.00 1
08/27/2014 09/29/2014 Coal River Mining LLC 245.00 9
04/08/2014 07/28/2014 Coal River Mining LLC 27.00 3
03/10/2014 03/31/2014 Coal River Mining LLC 125.25 3
01/28/2014 02/05/2014 Coal River Mining LLC 9.00 1
01/28/2014 02/18/2014 Coal River Mining LLC 4.50 1
11/20/2013 11/24/2013 Coal River Mining LLC 13.50 1
07/31/2013 08/29/2013 Coal River Mining LLC 127.00 2
02/04/2013 03/28/2013 Coal River Mining LLC 95.25 3
07/17/2012 08/09/2012 Coal River Mining LLC 107.50 1
03/14/2012 03/15/2012 Coal River Mining LLC 9.50 1
01/03/2012 01/26/2012 Coal River Mining LLC 104.00 2
07/07/2011 09/29/2011 Coal River Mining LLC 55.75 1
03/11/2011 03/14/2011 Coal River Mining LLC 11.00 1
02/16/2011 03/29/2011 Coal River Mining LLC 64.00 1
11/09/2010 12/01/2010 Coal River Mining LLC 7.25 1
09/15/2010 09/22/2010 Coal River Mining LLC 60.25 4
03/22/2010 03/26/2010 Coal River Mining LLC 6.75 1