Minnehan #1 Surface — Inspections

Total: 11 inspections

Begin End Operator Hours Inspectors
01/08/2003 01/08/2003 Minnehan Mining Llc 3.50 1
10/01/2002 10/01/2002 Minnehan Mining Llc 8.00 1
06/04/2002 06/06/2002 Minnehan Mining Llc 47.50 2
05/20/2002 06/06/2002 Minnehan Mining Llc 8.00 1
05/20/2002 05/22/2002 Minnehan Mining Llc 8.00 1
03/20/2002 03/25/2002 Minnehan Mining Llc 14.50 1
02/21/2002 02/28/2002 Minnehan Mining Llc 13.00 1
02/06/2002 02/07/2002 Minnehan Mining Llc 6.00 1
09/17/2001 09/26/2001 Minnehan Mining Llc 10.50 1
09/17/2001 09/18/2001 Minnehan Mining Llc 9.00 1
08/23/2001 09/27/2001 Minnehan Mining Llc 33.00 2