MLC - Calera — Inspections
Total: 128 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 02/24/2005 | 02/25/2005 | Peak Lime, Inc. | 6.00 | 1 |
| 12/14/2004 | 12/14/2004 | Peak Lime, Inc. | 17.00 | 1 |
| 11/23/2004 | 11/23/2004 | Peak Lime, Inc. | 10.00 | 1 |
| 10/26/2004 | 11/05/2004 | Peak Lime, Inc. | 95.00 | 1 |
| 03/22/2004 | 03/22/2004 | Peak Lime, Inc. | 4.00 | 1 |
| 03/04/2004 | 04/09/2004 | Peak Lime, Inc. | 8.00 | 1 |
| 02/26/2004 | 02/27/2004 | Peak Lime, Inc. | 5.00 | 1 |
| 02/05/2004 | 02/05/2004 | Peak Lime, Inc. | 4.00 | 1 |
| 01/29/2004 | 01/30/2004 | Peak Lime, Inc. | 26.00 | 2 |
| 01/15/2004 | 01/15/2004 | Peak Lime, Inc. | 11.00 | 1 |
| 01/05/2004 | 01/09/2004 | Peak Lime, Inc. | 7.00 | 1 |
| 12/08/2003 | 12/08/2003 | Peak Lime, Inc. | 12.00 | 2 |
| 11/23/2003 | 11/24/2003 | Peak Lime, Inc. | 13.00 | 1 |
| 11/12/2003 | 11/12/2003 | Peak Lime, Inc. | 33.00 | 1 |
| 10/24/2003 | 11/06/2003 | Peak Lime, Inc. | 98.00 | 1 |
| 08/05/2003 | 08/05/2003 | Peak Lime, Inc. | 3.00 | 1 |
| 04/29/2003 | 04/29/2003 | Peak Lime, Inc. | 2.00 | 1 |
| 04/14/2003 | 04/21/2003 | Peak Lime, Inc. | 45.00 | 1 |
| 12/30/2002 | 12/30/2002 | Peak Lime, Inc. | 5.00 | 1 |
| 11/05/2002 | 11/14/2002 | Peak Lime, Inc. | 39.00 | 1 |
| 10/24/2002 | 10/24/2002 | Peak Lime, Inc. | 5.00 | 1 |
| 10/15/2002 | 10/18/2002 | Peak Lime, Inc. | 15.00 | 1 |
| 09/12/2002 | 09/12/2002 | Peak Lime, Inc. | 6.00 | 1 |
| 08/22/2002 | 08/28/2002 | Peak Lime, Inc. | 26.00 | 2 |
| 07/03/2002 | 07/11/2002 | Peak Lime, Inc. | 26.00 | 1 |
| 05/31/2002 | 06/04/2002 | Peak Lime, Inc. | 14.00 | 1 |
| 05/02/2002 | 05/02/2002 | Peak Lime, Inc. | 3.00 | 1 |
| 04/25/2002 | 04/29/2002 | Peak Lime, Inc. | 39.00 | 1 |