Molloy-Clay Highwall Miner — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
05/22/2000 05/22/2000 Molloy Mining Inc 5.00 1
05/08/2000 05/15/2000 Molloy Mining Inc 8.00 1
04/27/2000 05/15/2000 Molloy Mining Inc 15.00 1
04/04/2000 04/04/2000 Molloy Mining Inc 8.00 1
04/03/2000 04/20/2000 Molloy Mining Inc 24.00 2
03/01/2000 03/01/2000 Molloy Mining Inc 8.00 1