MONCUS PIT 2 — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
08/08/2002 08/09/2002 Louis Moncus Construction 16.00 2
05/15/2002 05/16/2002 Louis Moncus Construction 9.00 1
12/05/2000 12/06/2000 Louis Moncus Construction 11.00 1
02/17/2000 02/17/2000 Louis Moncus Construction 4.00 1
02/01/2000 02/01/2000 Louis Moncus Construction 18.00 1