Mount Airy Plant — Inspections

Total: 74 inspections

Begin End Operator Hours Inspectors
11/26/2007 11/29/2007 Ararat Rock Products 33.75 1
05/14/2007 05/14/2007 Ararat Rock Products 10.00 1
04/25/2007 04/26/2007 Ararat Rock Products 6.00 1
11/28/2006 12/13/2006 Ararat Rock Products 53.00 1
07/27/2006 07/27/2006 Ararat Rock Products 10.00 1
07/18/2006 07/18/2006 Ararat Rock Products 1.00 1
06/29/2006 06/29/2006 Ararat Rock Products 3.50 1
06/26/2006 06/29/2006 Ararat Rock Products 32.00 1
02/27/2006 03/07/2006 Ararat Rock Products 55.00 1
02/09/2006 02/09/2006 Ararat Rock Products 8.00 1
08/22/2005 08/25/2005 Ararat Rock Products 35.00 2
03/09/2005 03/14/2005 Ararat Rock Products 37.00 2
06/29/2004 07/01/2004 Ararat Rock Products 28.00 1
11/03/2003 11/05/2003 Ararat Rock Products 27.00 1
08/05/2003 08/05/2003 Ararat Rock Products 4.00 1
07/07/2003 07/08/2003 Ararat Rock Products 13.00 1
01/13/2003 01/14/2003 Ararat Rock Products 19.00 1
10/21/2002 10/21/2002 Ararat Rock Products 1.00 1
08/15/2002 08/15/2002 Ararat Rock Products 3.00 1
08/14/2002 08/15/2002 Ararat Rock Products 14.00 1
12/10/2001 12/13/2001 Ararat Rock Products 36.00 1
05/22/2001 05/24/2001 Ararat Rock Products 30.00 1
01/24/2001 01/25/2001 Ararat Rock Products 19.00 1
06/27/2000 06/29/2000 Ararat Rock Products 26.00 1