Murby's Pit / Lippmann Crusher — Inspections

Total: 66 inspections

Begin End Operator Hours Inspectors
04/19/2007 04/20/2007 G Lopes Construction Inc 13.50 1
03/27/2007 03/27/2007 G Lopes Construction Inc 2.50 1
03/15/2007 03/15/2007 G Lopes Construction Inc 9.50 1
11/28/2005 11/30/2005 G Lopes Construction Inc 20.00 1
01/13/2005 01/20/2005 G Lopes Construction Inc 22.00 1
07/21/2004 07/21/2004 G Lopes Construction Inc 4.00 1
05/11/2004 05/12/2004 G Lopes Construction Inc 22.00 1
11/17/2003 11/19/2003 G Lopes Construction Inc 1.00 1
11/17/2003 11/19/2003 G Lopes Construction Inc 1.00 1
06/24/2003 06/24/2003 G Lopes Construction Inc 8.00 1
02/11/2003 02/12/2003 G Lopes Construction Inc 18.00 1
02/26/2002 02/26/2002 G Lopes Construction Inc 3.00 1
01/29/2002 01/30/2002 G Lopes Construction Inc 16.00 1
02/08/2001 02/09/2001 G Lopes Construction Inc 15.00 1
06/07/2000 06/08/2000 G Lopes Construction Inc 20.00 1
06/07/2000 06/21/2000 G Lopes Construction Inc 29.00 1