Nadeau Site — Inspections
Total: 25 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 04/30/2013 | 04/30/2013 | Technisand Inc | 3.50 | 1 |
| 01/08/2013 | 01/08/2013 | Technisand Inc | 3.50 | 1 |
| 07/26/2012 | 07/27/2012 | Technisand Inc | 7.25 | 1 |
| 03/06/2012 | 03/06/2012 | Technisand Inc | 18.25 | 1 |
| 08/15/2011 | 08/15/2011 | Technisand Inc | 2.50 | 1 |
| 08/04/2011 | 08/04/2011 | Technisand Inc | 4.00 | 1 |
| 07/26/2011 | 07/26/2011 | Technisand Inc | 7.00 | 1 |
| 11/24/2010 | 11/24/2010 | Technisand Inc | 5.50 | 1 |
| 07/13/2010 | 07/21/2010 | Technisand Inc | 16.50 | 1 |
| 09/23/2009 | 09/23/2009 | Technisand Inc | 2.50 | 1 |
| 09/02/2009 | 09/04/2009 | Technisand Inc | 17.75 | 1 |
| 07/29/2008 | 07/29/2008 | Technisand Inc | 5.00 | 1 |
| 07/15/2008 | 07/16/2008 | Technisand Inc | 15.00 | 1 |
| 05/19/2008 | 05/20/2008 | Technisand Inc | 6.00 | 1 |
| 09/24/2007 | 09/25/2007 | Technisand Inc | 5.00 | 1 |
| 08/28/2006 | 08/30/2006 | Technisand Inc | 16.00 | 1 |
| 05/18/2006 | 05/18/2006 | Technisand Inc | 3.50 | 1 |
| 09/21/2005 | 09/21/2005 | Technisand Inc | 13.00 | 2 |
| 08/31/2005 | 09/08/2005 | Technisand Inc | 17.50 | 1 |
| 11/04/2004 | 11/04/2004 | Technisand Inc | 9.00 | 1 |
| 11/04/2003 | 11/06/2003 | Technisand Inc | 11.00 | 1 |
| 10/28/2003 | 10/28/2003 | Technisand Inc | 1.00 | 1 |
| 07/02/2003 | 07/02/2003 | Technisand Inc | 10.00 | 1 |
| 09/24/2002 | 09/24/2002 | Technisand Inc | 16.00 | 1 |
| 07/27/2000 | 07/27/2000 | Technisand Inc | 21.00 | 2 |