Nadeau Site — Inspections

Total: 25 inspections

Begin End Operator Hours Inspectors
04/30/2013 04/30/2013 Technisand Inc 3.50 1
01/08/2013 01/08/2013 Technisand Inc 3.50 1
07/26/2012 07/27/2012 Technisand Inc 7.25 1
03/06/2012 03/06/2012 Technisand Inc 18.25 1
08/15/2011 08/15/2011 Technisand Inc 2.50 1
08/04/2011 08/04/2011 Technisand Inc 4.00 1
07/26/2011 07/26/2011 Technisand Inc 7.00 1
11/24/2010 11/24/2010 Technisand Inc 5.50 1
07/13/2010 07/21/2010 Technisand Inc 16.50 1
09/23/2009 09/23/2009 Technisand Inc 2.50 1
09/02/2009 09/04/2009 Technisand Inc 17.75 1
07/29/2008 07/29/2008 Technisand Inc 5.00 1
07/15/2008 07/16/2008 Technisand Inc 15.00 1
05/19/2008 05/20/2008 Technisand Inc 6.00 1
09/24/2007 09/25/2007 Technisand Inc 5.00 1
08/28/2006 08/30/2006 Technisand Inc 16.00 1
05/18/2006 05/18/2006 Technisand Inc 3.50 1
09/21/2005 09/21/2005 Technisand Inc 13.00 2
08/31/2005 09/08/2005 Technisand Inc 17.50 1
11/04/2004 11/04/2004 Technisand Inc 9.00 1
11/04/2003 11/06/2003 Technisand Inc 11.00 1
10/28/2003 10/28/2003 Technisand Inc 1.00 1
07/02/2003 07/02/2003 Technisand Inc 10.00 1
09/24/2002 09/24/2002 Technisand Inc 16.00 1
07/27/2000 07/27/2000 Technisand Inc 21.00 2