Neck Road Pit — Inspections

Total: 12 inspections

Begin End Operator Hours Inspectors
07/27/2005 07/28/2005 State Line Sand Inc 5.50 1
03/03/2005 03/03/2005 State Line Sand Inc 9.00 1
09/16/2004 09/16/2004 State Line Sand Inc 7.00 1
03/16/2004 03/16/2004 State Line Sand Inc 13.00 1
02/12/2004 02/12/2004 State Line Sand Inc 6.00 1
10/21/2003 10/21/2003 State Line Sand Inc 6.00 1
09/09/2003 09/09/2003 State Line Sand Inc 8.00 1
03/11/2003 03/12/2003 State Line Sand Inc 14.00 1
08/01/2002 08/02/2002 State Line Sand Inc 10.00 1
11/29/2001 11/29/2001 State Line Sand Inc 11.00 1
06/20/2001 06/20/2001 State Line Sand Inc 20.00 1
08/02/2000 08/03/2000 State Line Sand Inc 15.00 1