Neiswonger Portable Plant — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
11/17/2020 11/17/2020 Neiswonger Construction Inc 2.75 1
01/22/2020 01/24/2020 Neiswonger Construction Inc 7.25 1
11/15/2018 11/15/2018 Neiswonger Construction Inc 3.00 1
10/02/2017 10/03/2017 Neiswonger Construction Inc 12.00 1
04/04/2017 04/04/2017 Neiswonger Construction Inc 12.50 1
03/23/2017 03/24/2017 Neiswonger Construction Inc 18.25 1