New Liberty Plant (MC-41) — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
07/19/2023 07/20/2023 Riverstone Group, Inc. 5.50 1
04/05/2022 04/05/2022 Riverstone Group, Inc. 6.00 1
07/20/2021 07/20/2021 Riverstone Group, Inc. 1.00 1
06/30/2020 07/01/2020 Riverstone Group, Inc. 21.75 1