NEWBERRY PIT — Inspections
Total: 5 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 03/06/2001 | 03/06/2001 | Webster Excavating | 3.00 | 1 |
| 09/19/2000 | 09/19/2000 | Webster Excavating | 2.00 | 1 |
| 09/05/2000 | 09/05/2000 | Webster Excavating | 5.00 | 1 |
| 08/28/2000 | 08/28/2000 | Webster Excavating | 2.00 | 1 |
| 08/02/2000 | 08/08/2000 | Webster Excavating | 25.00 | 1 |