NMP Mariposa Operation — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 08/29/2007 | 08/29/2007 | Noble Metals Processing LLC | 1.00 | 1 |
| 02/15/2007 | 02/15/2007 | Noble Metals Processing LLC | 3.25 | 1 |
| 09/20/2006 | 09/21/2006 | Noble Metals Processing LLC | 16.25 | 2 |
| 07/20/2006 | 07/20/2006 | Noble Metals Processing LLC | 7.50 | 1 |