No 1 — Inspections

Total: 27 inspections

Begin End Operator Hours Inspectors
04/30/2008 04/30/2008 Enviroserve Inc 4.50 1
12/19/2007 12/20/2007 Enviroserve Inc 4.00 1
01/09/2007 01/11/2007 Enviroserve Inc 3.50 1
02/06/2006 02/06/2006 Enviroserve Inc 10.25 2
01/10/2006 01/19/2006 Enviroserve Inc 30.00 1
05/25/2005 09/22/2005 Enviroserve Inc 49.00 2
10/18/2004 12/20/2004 Enviroserve Inc 29.50 2
06/08/2004 06/08/2004 Enviroserve Inc 4.50 1
06/08/2004 06/08/2004 Enviroserve Inc 6.00 1
06/04/2004 06/06/2004 Enviroserve Inc 16.00 1
04/12/2004 06/08/2004 Enviroserve Inc 8.50 1
03/30/2004 03/31/2004 Enviroserve Inc 14.00 1
04/01/2002 07/09/2002 Enviroserve Inc 29.50 3
10/10/2001 10/11/2001 Enviroserve Inc 6.75 1
10/10/2001 12/18/2001 Enviroserve Inc 10.75 1
09/05/2001 09/05/2001 Enviroserve Inc 6.50 1
09/05/2001 09/05/2001 Enviroserve Inc 6.50 1
04/23/2001 07/18/2001 Enviroserve Inc 19.50 2
02/06/2001 02/07/2001 Enviroserve Inc 6.25 1
11/01/2000 12/05/2000 Enviroserve Inc 5.50 1
10/17/2000 12/11/2000 Enviroserve Inc 31.75 1
09/27/2000 10/02/2000 Enviroserve Inc 7.50 2
08/01/2000 08/01/2000 Enviroserve Inc 4.00 1
07/11/2000 07/20/2000 Enviroserve Inc 7.00 1
07/11/2000 07/20/2000 Enviroserve Inc 7.50 1
06/19/2000 07/20/2000 Enviroserve Inc 14.00 1
01/10/2000 01/10/2000 Progressive Excavation Llc 8.00 1