No 1 Surface Mine — Inspections

Total: 2 inspections

Begin End Operator Hours Inspectors
07/12/2006 07/13/2006 Ed Coal Inc 6.50 2
05/22/2006 08/03/2006 Ed Coal Inc 84.75 2