No. 5 — Inspections
Total: 155 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 08/16/2006 | 08/16/2006 | DaCoal Mining, Inc. | 8.50 | 1 |
| 08/03/2006 | 08/03/2006 | DaCoal Mining, Inc. | 3.50 | 1 |
| 06/30/2006 | 06/30/2006 | Clintwood Elkhorn Mining Co | 5.50 | 1 |
| 03/07/2006 | 03/13/2006 | Clintwood Elkhorn Mining Co | 8.25 | 1 |
| 12/08/2005 | 12/22/2005 | Clintwood Elkhorn Mining Co | 10.00 | 1 |