No.1 — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
07/01/2013 08/14/2013 State Line Mining, Inc. 17.50 1
05/21/2013 05/21/2013 State Line Mining, Inc. 12.00 1
04/09/2013 04/16/2013 State Line Mining, Inc. 14.50 1
04/09/2013 05/08/2013 State Line Mining, Inc. 96.50 2
01/02/2013 03/13/2013 State Line Mining, Inc. 86.25 4
05/29/2012 06/28/2012 State Line Mining, Inc. 29.25 3
12/08/2011 12/08/2011 State Line Mining, Inc. 10.50 2