Noatak River Pit — Inspections
Total: 3 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 07/31/2025 | 07/31/2025 | Drake Construction Inc. | 3.00 | 1 |
| 08/26/2022 | 08/26/2022 | Drake Construction Inc. | 0.50 | 1 |
| 09/07/2021 | 09/07/2021 | Drake Construction Inc. | 6.00 | 1 |
Total: 3 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 07/31/2025 | 07/31/2025 | Drake Construction Inc. | 3.00 | 1 |
| 08/26/2022 | 08/26/2022 | Drake Construction Inc. | 0.50 | 1 |
| 09/07/2021 | 09/07/2021 | Drake Construction Inc. | 6.00 | 1 |