Total: 3 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 05/07/2008 | 05/08/2008 | Noble Construction Inc | 4.50 | 1 |
| 08/31/2007 | 08/31/2007 | Noble Construction Inc | 9.00 | 1 |
| 07/17/2006 | 07/18/2006 | Noble Construction Inc | 6.50 | 1 |