North River Mine — Inspections

Total: 1,481 inspections

Begin End Operator Hours Inspectors
04/05/2000 04/12/2000 Chevron Mining Inc 14.00 1
04/03/2000 06/22/2000 Chevron Mining Inc 382.75 8
03/28/2000 03/28/2000 Chevron Mining Inc 11.00 1
03/27/2000 04/07/2000 Chevron Mining Inc 26.00 1
03/26/2000 04/24/2000 Chevron Mining Inc 21.00 2
03/20/2000 03/28/2000 Chevron Mining Inc 9.00 1
03/20/2000 03/21/2000 Chevron Mining Inc 8.00 1
03/20/2000 03/21/2000 Chevron Mining Inc 10.00 1
03/15/2000 03/16/2000 Chevron Mining Inc 11.00 1
03/14/2000 03/15/2000 Chevron Mining Inc 6.50 1
03/14/2000 03/28/2000 Chevron Mining Inc 9.00 1
03/14/2000 03/14/2000 Chevron Mining Inc 10.00 1
03/06/2000 03/06/2000 Chevron Mining Inc 7.00 2
03/06/2000 03/06/2000 Chevron Mining Inc 12.50 2
02/29/2000 03/14/2000 Chevron Mining Inc 12.50 1
02/29/2000 03/21/2000 Chevron Mining Inc 16.25 1
02/28/2000 02/28/2000 Chevron Mining Inc 6.00 1
02/23/2000 02/23/2000 Chevron Mining Inc 7.00 1
02/23/2000 02/23/2000 Chevron Mining Inc 2.00 1
02/23/2000 02/23/2000 Chevron Mining Inc 12.50 1
02/16/2000 02/16/2000 Chevron Mining Inc 15.00 2
02/10/2000 02/10/2000 Chevron Mining Inc 3.00 1
02/10/2000 02/10/2000 Chevron Mining Inc 8.00 1
02/08/2000 02/08/2000 Chevron Mining Inc 11.00 1
02/03/2000 02/03/2000 Chevron Mining Inc 8.00 1
01/27/2000 01/27/2000 Chevron Mining Inc 10.50 1
01/19/2000 01/19/2000 Chevron Mining Inc 10.50 1
01/19/2000 01/19/2000 Chevron Mining Inc 9.50 1
01/19/2000 01/19/2000 Chevron Mining Inc 10.00 1
01/10/2000 01/10/2000 Chevron Mining Inc 10.00 1
01/04/2000 01/04/2000 Chevron Mining Inc 12.00 1