Onyx Portable 3 — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 04/29/2003 | 04/29/2003 | Onyx Construction Incorporated | 4.00 | 1 |
| 03/26/2003 | 03/26/2003 | Onyx Construction Incorporated | 5.00 | 1 |
| 02/26/2003 | 02/27/2003 | Onyx Construction Incorporated | 30.00 | 2 |
| 11/21/2002 | 11/26/2002 | Onyx Construction Incorporated | 41.00 | 2 |