Pardee Surface — Inspections

Total: 65 inspections

Begin End Operator Hours Inspectors
01/07/2002 03/28/2002 Cumberland River Coal LLC 95.75 2
07/11/2001 07/12/2001 Cumberland River Coal LLC 4.00 1
05/17/2001 06/04/2001 Cumberland River Coal LLC 7.00 1
05/07/2001 06/04/2001 Cumberland River Coal LLC 13.00 1
04/27/2001 06/04/2001 Cumberland River Coal LLC 42.00 1
04/11/2001 04/30/2001 Cumberland River Coal LLC 5.50 1
03/09/2001 03/20/2001 Cumberland River Coal LLC 32.00 1
01/29/2001 02/08/2001 Cumberland River Coal LLC 19.50 1
11/16/2000 12/20/2000 Cumberland River Coal LLC 8.00 1
11/14/2000 01/08/2001 Cumberland River Coal LLC 71.00 1
05/31/2000 06/20/2000 Cumberland River Coal LLC 7.00 1
05/30/2000 06/21/2000 Cumberland River Coal LLC 57.50 1
03/07/2000 03/07/2000 Cumberland River Coal LLC 3.50 1
01/12/2000 01/26/2000 Cumberland River Coal LLC 7.00 1
01/10/2000 02/10/2000 Cumberland River Coal LLC 32.50 1