Park Road Plant — Inspections

Total: 22 inspections

Begin End Operator Hours Inspectors
08/28/2008 08/29/2008 Central Pre-Mix Concrete Co. 7.50 1
04/29/2008 04/29/2008 Central Pre-Mix Concrete Co. 11.75 1
10/22/2007 10/23/2007 Central Pre-Mix Concrete Co. 21.00 1
05/02/2007 05/03/2007 Central Pre-Mix Concrete Co. 19.00 1
01/09/2007 01/09/2007 Central Pre-Mix Concrete Co. 16.00 1
09/20/2006 09/20/2006 Central Pre-Mix Concrete Co. 10.25 1
03/21/2006 03/21/2006 Central Pre-Mix Concrete Co. 4.00 1
03/01/2006 03/02/2006 Central Pre-Mix Concrete Co. 20.00 1
08/09/2005 08/09/2005 Central Pre-Mix Concrete Co. 4.00 1
07/20/2005 07/21/2005 Central Pre-Mix Concrete Co. 21.50 1
12/01/2004 12/02/2004 Central Pre-Mix Concrete Co. 25.00 1
05/25/2004 05/26/2004 Central Pre-Mix Concrete Co. 28.00 1
11/04/2003 11/05/2003 Central Pre-Mix Concrete Co. 23.00 1
05/08/2003 05/15/2003 Central Pre-Mix Concrete Co. 40.00 1
05/08/2003 05/08/2003 Central Pre-Mix Concrete Co. 1.00 1
01/08/2003 01/08/2003 Central Pre-Mix Concrete Co. 22.00 1
10/22/2002 10/22/2002 Central Pre-Mix Concrete Co. 5.00 1
07/23/2002 07/24/2002 Central Pre-Mix Concrete Co. 21.00 1
04/25/2002 04/26/2002 Central Pre-Mix Concrete Co. 20.00 1
01/23/2002 01/23/2002 Central Pre-Mix Concrete Co. 3.00 1
08/13/2001 08/13/2001 Central Pre-Mix Concrete Co. 10.00 1
05/16/2000 05/17/2000 Acme Materials & Construction... 16.00 1