Parkers Prairie Pit #2 — Inspections

Total: 11 inspections

Begin End Operator Hours Inspectors
11/12/2025 11/12/2025 Mark Lee Excavating Inc 8.50 1
07/07/2025 07/10/2025 Mark Lee Excavating Inc 15.50 1
11/25/2024 11/26/2024 Mark Lee Excavating Inc 11.75 1
11/15/2023 11/15/2023 Mark Lee Excavating Inc 7.00 1
07/11/2023 07/11/2023 Mark Lee Excavating Inc 4.75 1
09/13/2022 09/13/2022 Mark Lee Excavating Inc 3.75 1
11/10/2020 11/10/2020 Mark Lee Excavating Inc 7.50 1
06/01/2020 06/02/2020 Mark Lee Excavating Inc 6.75 1
10/21/2018 10/25/2018 Mark Lee Excavating Inc 27.00 1
08/28/2018 08/29/2018 Mark Lee Excavating Inc 8.00 1
08/08/2017 08/09/2017 Mark Lee Excavating Inc 9.00 1