PCP #2 — Inspections

Total: 11 inspections

Begin End Operator Hours Inspectors
04/18/2006 04/18/2006 Hallett Materials Inc 3.00 1
03/22/2005 03/23/2005 Hallett Materials Inc 19.00 1
03/08/2005 03/14/2005 Hallett Materials Inc 9.00 2
12/02/2004 12/02/2004 Hallett Materials Inc 7.00 1
11/22/2004 11/23/2004 Hallett Materials Inc 28.00 1
01/22/2004 01/22/2004 Hallett Materials Inc 1.00 1
01/21/2004 01/22/2004 Hallett Materials Inc 15.00 1
06/24/2003 06/24/2003 Hallett Materials Inc 4.00 1
10/15/2001 10/15/2001 Hallett Materials Inc 5.00 1
09/18/2001 09/20/2001 Hallett Materials Inc 22.00 1
03/01/2000 03/07/2000 Hallett Materials Inc 19.00 1