PCP #7 — Inspections

Total: 16 inspections

Begin End Operator Hours Inspectors
07/18/2007 07/24/2007 Hallett Materials Inc 28.25 1
06/01/2006 06/01/2006 Hallett Materials Inc 6.00 1
09/19/2005 09/19/2005 Hallett Materials Inc 3.50 1
04/13/2005 04/13/2005 K P Materials Inc 17.50 1
08/19/2004 08/19/2004 K P Materials Inc 3.00 1
07/21/2004 07/22/2004 K P Materials Inc 16.00 1
06/18/2003 06/18/2003 K P Materials Inc 3.00 1
06/10/2003 06/11/2003 K P Materials Inc 21.00 1
10/08/2002 10/08/2002 K P Materials Inc 3.00 1
08/27/2002 09/05/2002 K P Materials Inc 75.00 2
07/25/2001 07/25/2001 K P Materials Inc 4.00 1
07/18/2001 07/18/2001 K P Materials Inc 3.00 1
07/31/2000 07/31/2000 K P Materials Inc 3.00 1
06/01/2000 06/01/2000 K P Materials Inc 2.00 1
05/18/2000 05/18/2000 K P Materials Inc 8.00 1
04/25/2000 04/25/2000 K P Materials Inc 15.00 1