PHELPS PIT — Inspections

Total: 12 inspections

Begin End Operator Hours Inspectors
03/22/2004 03/22/2004 Big Buck Asphalt Inc 2.00 1
11/04/2003 11/04/2003 Big Buck Asphalt Inc 2.00 1
08/07/2003 08/07/2003 Big Buck Asphalt Inc 7.00 1
10/23/2002 10/23/2002 Big Buck Asphalt Inc 3.00 1
10/08/2002 10/08/2002 Big Buck Asphalt Inc 12.00 1
07/16/2002 07/17/2002 Big Buck Asphalt Inc 9.00 1
02/07/2002 02/08/2002 Big Buck Asphalt Inc 6.00 1
12/04/2001 12/05/2001 Big Buck Asphalt Inc 18.00 1
09/10/2001 09/12/2001 Big Buck Asphalt Inc 3.00 1
06/12/2001 06/21/2001 Big Buck Asphalt Inc 53.00 1
08/02/2000 08/02/2000 Big Buck Asphalt Inc 3.00 1
05/23/2000 05/24/2000 Big Buck Asphalt Inc 11.00 1