Pima Mobile 1 — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 10/12/2010 | 10/14/2010 | Arizona General Engineering Co... | 15.25 | 2 |
| 12/09/2009 | 12/09/2009 | Arizona General Engineering Co... | 6.00 | 1 |
| 07/28/2009 | 07/29/2009 | Arizona General Engineering Co... | 5.00 | 1 |
| 07/27/2009 | 07/28/2009 | 10.75 | 1 |