Pipe Creek Jr — Inspections

Total: 70 inspections

Begin End Operator Hours Inspectors
03/30/2006 03/30/2006 Irving Materials Inc 5.00 1
02/28/2006 03/02/2006 Irving Materials Inc 35.00 1
04/27/2005 04/27/2005 Irving Materials Inc 0.50 1
04/25/2005 04/27/2005 Irving Materials Inc 20.50 1
12/29/2004 12/30/2004 Irving Materials Inc 14.00 1
08/24/2004 08/25/2004 Irving Materials Inc 23.00 1
03/24/2004 03/25/2004 Irving Materials Inc 16.00 1
08/27/2003 08/27/2003 Irving Materials Inc 14.00 1
08/21/2003 08/21/2003 Irving Materials Inc 2.00 1
01/07/2003 01/08/2003 Irving Materials Inc 32.00 1
10/16/2002 10/16/2002 Irving Materials Inc 7.00 1
07/09/2002 07/10/2002 Irving Materials Inc 19.00 1
01/09/2002 01/09/2002 Irving Materials Inc 4.00 1
01/03/2002 01/09/2002 Irving Materials Inc 34.00 1
09/19/2001 09/19/2001 Irving Materials Inc 25.00 2
12/14/2000 12/14/2000 Irving Materials Inc 9.00 1
10/11/2000 10/12/2000 Irving Materials Inc 18.00 1
09/27/2000 09/27/2000 Irving Materials Inc 8.00 1
06/01/2000 06/01/2000 Irving Materials Inc 5.00 1
05/02/2000 05/04/2000 Irving Materials Inc 33.00 1