Pit #1 — Inspections

Total: 31 inspections

Begin End Operator Hours Inspectors
07/22/2025 07/22/2025 River Bend Materials LLC 7.00 1
05/22/2024 05/22/2024 River Bend Materials LLC 1.50 1
04/08/2024 04/08/2024 River Bend Materials LLC 3.00 1
04/03/2024 04/03/2024 River Bend Materials LLC 10.50 1
07/19/2023 07/20/2023 River Bend Materials LLC 3.25 1
07/13/2023 07/13/2023 River Bend Materials LLC 8.00 1
01/12/2023 01/12/2023 River Bend Materials LLC 3.25 1
11/23/2021 11/23/2021 River Bend Materials LLC 14.00 1
03/25/2021 03/25/2021 River Bend Materials LLC 11.25 1
10/22/2019 10/31/2019 River Bend Materials LLC 61.25 2
10/21/2019 10/22/2019 River Bend Materials LLC 8.75 1
09/30/2019 10/01/2019 River Bend Materials LLC 9.50 1
07/18/2019 07/18/2019 River Bend Materials LLC 5.50 1
07/02/2019 07/02/2019 River Bend Materials LLC 8.25 1
02/05/2018 02/05/2018 River Bend Materials LLC 9.25 1
06/06/2017 06/06/2017 River Bend Materials LLC 4.00 1
03/30/2016 03/30/2016 River Bend Materials LLC 10.00 1
11/17/2015 11/17/2015 River Bend Materials LLC 2.50 1
10/28/2015 10/29/2015 River Bend Materials LLC 9.75 1
04/20/2015 04/20/2015 River Bend Materials LLC 3.00 1
04/13/2015 04/14/2015 River Bend Materials LLC 15.00 1
03/25/2014 03/25/2014 River Bend Materials LLC 11.00 1
08/28/2013 08/29/2013 River Bend Materials LLC 17.75 1
03/13/2013 03/13/2013 River Bend Materials LLC 2.25 1
11/09/2011 11/09/2011 Swearingen Excavating 4.75 1
10/25/2011 10/26/2011 Swearingen Excavating 18.00 1
07/28/2011 07/29/2011 Swearingen Excavating 12.00 1
09/07/2010 09/07/2010 Swearingen Excavating 3.00 1
10/05/2009 10/05/2009 Swearingen Excavating 4.75 1
09/21/2009 09/22/2009 Swearingen Excavating 19.25 1
09/08/2009 09/09/2009 Swearingen Excavating 14.75 1