Pit 2 B — Inspections

Total: 12 inspections

Begin End Operator Hours Inspectors
02/19/2026 02/24/2026 Elk River Stone LLC 16.25 1
04/02/2025 04/04/2025 Elk River Stone LLC 7.75 1
12/12/2024 12/13/2024 Elk River Stone LLC 7.00 1
06/03/2024 06/05/2024 Elk River Stone LLC 4.00 1
02/26/2024 02/29/2024 Elk River Stone LLC 11.75 1
09/05/2023 09/07/2023 Elk River Stone LLC 25.50 1
06/06/2023 06/08/2023 Elk River Stone LLC 5.25 1
02/27/2023 03/02/2023 Elk River Stone LLC 7.00 1
09/27/2022 09/29/2022 Elk River Stone LLC 13.75 1
08/22/2022 08/23/2022 Elk River Stone LLC 3.25 1
08/15/2022 08/18/2022 Elk River Stone LLC 7.75 1
12/15/2021 12/17/2021 Elk River Stone LLC 9.50 1