Plant #1 — Inspections

Total: 27 inspections

Begin End Operator Hours Inspectors
08/19/2020 08/19/2020 Healy Excavating 6.00 1
08/19/2019 08/19/2019 Healy Excavating 1.25 1
09/12/2018 09/13/2018 Healy Excavating 7.75 1
07/24/2017 07/24/2017 Healy Excavating 3.25 1
07/17/2017 07/17/2017 Healy Excavating 10.75 1
07/18/2016 07/25/2016 Healy Excavating 7.75 1
05/27/2015 05/27/2015 Healy Excavating 2.50 1
05/04/2015 05/04/2015 Healy Excavating 6.75 1
06/09/2014 06/09/2014 Healy Excavating 5.50 1
05/27/2014 05/27/2014 Healy Excavating 6.75 1
08/01/2013 08/01/2013 Healy Excavating 2.75 1
07/25/2013 07/25/2013 Healy Excavating 5.50 1
08/27/2012 08/31/2012 Healy Excavating 15.50 1
06/21/2012 06/21/2012 Healy Excavating 5.75 1
12/14/2010 12/14/2010 Healy Excavating 3.50 1
11/22/2010 11/23/2010 Healy Excavating 3.50 1
11/03/2010 11/08/2010 Healy Excavating 16.00 1
08/23/2010 08/23/2010 Healy Excavating 2.50 1
08/04/2010 08/04/2010 Healy Excavating 7.00 1
06/23/2009 06/23/2009 Healy Excavating 1.00 1
09/25/2008 09/25/2008 Healy Excavating 6.00 1
08/04/2008 09/19/2008 Healy Excavating 28.75 1
07/15/2008 07/15/2008 Healy Excavating 4.00 1
06/26/2008 06/26/2008 Healy Excavating 3.00 1
08/21/2007 08/21/2007 Healy Excavating 3.75 1
04/25/2007 04/25/2007 Healy Excavating 3.75 1
08/30/2006 08/30/2006 Healy Excavating 5.00 1