Plant #1 — Inspections

Total: 9 inspections

Begin End Operator Hours Inspectors
09/13/2005 09/14/2005 Town Of Andes 9.00 1
10/28/2003 10/29/2003 Town Of Andes 12.00 1
10/31/2002 10/31/2002 Town Of Andes 3.00 1
10/23/2002 10/24/2002 Town Of Andes 4.00 1
08/08/2002 08/08/2002 Town Of Andes 7.00 1
10/11/2001 10/11/2001 Town Of Andes 10.00 2
10/03/2001 10/03/2001 Town Of Andes 14.00 1
08/29/2001 08/29/2001 Town Of Andes 17.00 1
08/01/2000 08/01/2000 Town Of Andes 8.00 1