Plant 1 — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
07/23/2024 07/24/2024 Cass Custom Crushing, LLC 8.50 1
10/11/2022 10/13/2022 Merget Materials, LLC 15.50 1
05/11/2022 05/12/2022 Merget Materials, LLC 8.75 1
03/08/2022 03/08/2022 Merget Materials, LLC 4.25 1