Plant 2 — Inspections

Total: 64 inspections

Begin End Operator Hours Inspectors
07/13/2005 07/13/2005 MCC, Inc. 6.00 1
04/27/2005 04/27/2005 MCC, Inc. 2.50 1
03/02/2005 03/02/2005 MCC, Inc. 6.00 1
01/20/2005 01/20/2005 MCC, Inc. 1.00 1
01/19/2005 01/20/2005 MCC, Inc. 31.00 1
01/04/2005 01/04/2005 MCC, Inc. 4.00 1
03/11/2004 03/11/2004 MCC, Inc. 7.00 1
02/25/2004 02/25/2004 MCC, Inc. 21.00 1
03/05/2003 03/06/2003 MCC, Inc. 25.00 1
10/23/2002 10/23/2002 MCC, Inc. 4.00 1
08/27/2002 08/27/2002 MCC, Inc. 13.00 1
01/30/2002 01/31/2002 MCC, Inc. 44.00 1
06/14/2001 06/14/2001 MCC, Inc. 12.00 1
04/25/2000 04/25/2000 MCC, Inc. 20.00 1