Plant 2 Portable Crusher — Inspections
Total: 23 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 01/23/2015 | 01/23/2015 | Bolton Inc | 10.75 | 1 |
| 01/13/2015 | 01/15/2015 | Bolton Inc | 12.25 | 1 |
| 02/03/2014 | 02/04/2014 | Bolton Inc | 13.25 | 1 |
| 04/19/2013 | 04/22/2013 | Bolton Inc | 4.00 | 1 |
| 12/12/2011 | 12/13/2011 | Bolton Inc | 6.50 | 1 |
| 04/13/2011 | 04/13/2011 | Bolton Inc | 2.50 | 1 |
| 04/28/2010 | 04/30/2010 | Bolton Inc | 48.50 | 1 |
| 10/20/2009 | 10/22/2009 | Bolton Inc | 8.00 | 1 |
| 03/04/2009 | 03/06/2009 | Bolton Inc | 4.00 | 1 |
| 05/24/2008 | 05/24/2008 | Bolton Inc | 5.00 | 1 |
| 11/16/2006 | 11/16/2006 | Bolton Inc | 2.50 | 1 |
| 11/14/2005 | 11/14/2005 | Bolton Inc | 5.25 | 2 |
| 11/10/2005 | 11/14/2005 | Bolton Inc | 6.50 | 2 |
| 04/25/2005 | 04/29/2005 | Bolton Inc | 27.75 | 1 |
| 03/11/2004 | 03/11/2004 | Bolton Inc | 7.00 | 1 |
| 02/24/2004 | 02/24/2004 | Bolton Inc | 8.00 | 1 |
| 05/01/2003 | 05/01/2003 | Bolton Inc | 22.00 | 1 |
| 03/11/2003 | 03/11/2003 | Bolton Inc | 0.00 | 0 |
| 10/23/2002 | 10/23/2002 | Bolton Inc | 3.00 | 1 |
| 10/23/2002 | 10/23/2002 | Bolton Inc | 0.00 | 0 |
| 12/07/2001 | 12/07/2001 | Bolton Inc | 4.00 | 1 |
| 11/28/2001 | 11/28/2001 | Bolton Inc | 3.00 | 1 |
| 05/10/2001 | 05/10/2001 | Bolton Inc | 59.00 | 2 |