Plant 8 — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
11/07/2001 11/07/2001 International Material Inc 12.00 1
08/28/2001 08/29/2001 International Material Inc 19.00 1
02/06/2001 02/06/2001 International Material Inc 6.00 1