Plant 8 — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
09/02/2020 09/02/2020 Rawson Materials 4.25 1
04/16/2019 04/18/2019 Rawson Materials 30.00 1
08/31/2018 08/31/2018 Rawson Materials 4.00 1
02/23/2017 02/24/2017 CHERENZIA EXCAVATION INC. 6.50 1
08/11/2016 08/11/2016 CHERENZIA EXCAVATION INC. 6.75 1
01/27/2016 01/27/2016 CHERENZIA EXCAVATION INC. 6.25 1