Plant No. 1 — Inspections

Total: 20 inspections

Begin End Operator Hours Inspectors
11/17/2011 11/17/2011 Boon Construction Inc 15.00 1
05/25/2011 05/25/2011 Boon Construction Inc 9.50 1
10/21/2009 10/21/2009 Boon Construction Inc 9.00 1
06/03/2009 06/03/2009 Boon Construction Inc 12.50 1
06/10/2008 06/11/2008 Boon Construction Inc 25.25 1
05/14/2008 05/14/2008 Boon Construction Inc 2.25 1
10/17/2007 10/17/2007 Boon Construction Inc 1.25 1
04/10/2007 04/11/2007 Boon Construction Inc 30.50 1
06/08/2006 06/08/2006 Boon Construction Inc 14.00 1
06/21/2005 06/22/2005 Boon Construction Inc 12.25 1
04/28/2004 04/29/2004 Boon Construction Inc 23.00 1
02/05/2004 02/05/2004 Boon Construction Inc 12.00 1
11/26/2002 11/27/2002 Boon Construction Inc 13.00 1
10/24/2002 10/24/2002 Boon Construction Inc 3.00 1
04/16/2002 04/17/2002 Boon Construction Inc 8.00 1
03/27/2002 03/27/2002 Boon Construction Inc 8.00 1
11/29/2000 11/29/2000 Boon Construction Inc 5.00 1
11/28/2000 11/28/2000 Boon Construction Inc 2.00 1
11/15/2000 11/15/2000 Boon Construction Inc 2.00 1
05/23/2000 05/24/2000 Boon Construction Inc 21.00 1