Plant No. 2 Tesab Rotocrusher — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/29/2009 | 06/30/2009 | Bureau Of Indian Affairs | 4.25 | 1 |
| 08/15/2008 | 08/15/2008 | Bureau Of Indian Affairs | 7.75 | 1 |
| 06/17/2004 | 06/17/2004 | Bureau Of Indian Affairs | 5.00 | 1 |
| 09/24/2003 | 09/24/2003 | Bureau Of Indian Affairs | 8.00 | 1 |