Pleasant Hill — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
08/22/2011 08/22/2011 Hallett Materials 4.50 1
08/24/2010 08/24/2010 Hallett Materials 1.00 1
07/08/2009 07/08/2009 Hallett Materials 7.00 1
05/19/2009 05/20/2009 Hallett Materials 2.75 1
05/13/2008 05/13/2008 Hallett Materials 6.00 1
09/05/2007 09/05/2007 Hallett Materials Inc 5.50 1
07/26/2006 07/26/2006 Hallett Materials Inc 2.25 1