Pond Creek No 2 Mine — Inspections
Total: 5 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/27/2001 | 06/27/2001 | Triad Mining Inc | 8.00 | 1 |
| 04/25/2001 | 04/25/2001 | Triad Mining Inc | 5.00 | 1 |
| 04/02/2001 | 04/09/2001 | Triad Mining Inc | 24.00 | 1 |
| 10/02/2000 | 11/14/2000 | Triad Mining Inc | 35.50 | 1 |
| 09/14/2000 | 09/14/2000 | Triad Mining Inc | 9.00 | 1 |